From collectors and pipelines to large storm tanks. Nortúnel has a team of engineers with a great deal of national and international experience in order to successfully carry out a wide range of hydraulic projects.
Tunnel with a length of 308.91 m with an excavation section of some 23 m². The excavation took place using mechanical methods (ITC) in conglomerate and clay loam.
A tunnel 1500 m in length and with a 16 m² section to install a collector. Excavated using blasting and mechanical means on highly karstified limestone.
This website uses its own and third-party analysis cookies to gather information in order to improve our services, as well as for browsing analysis. If you continue to browse, you accept their installation. The user can configure their browser and, where they choose, can prevent them from being installed on their hard drive, although they must take into account that this may create browsing difficulties for this webpage.AcceptConfiguration guide