ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Tunnels

Tunnels

Integral construction of any type of tunnel, railway, road, hydraulics of any section and any geology. Our modern machine pool allows us to carry out excavations by blasting and by mechanical means, as well as having at our disposal the quickest and most effective support unit.

Nortúnel’s comprehensive solution also includes, if the customer requires, waterproofing and final coating.

Related projects

A-27. Tarragona Mont-Blanc. Tramo: variante de Valls - Montblanc. Túnel Lilla

En el tramo Variante de Valls – Montblanc de la autovía A-27 (Tarragona – Montblanc) situado en la provincia de Tarragona, se ha ejecutado un túnel de dos tubos gemelos […]

Leguizamón Tunnel

Excavation, support and coating of the Leguizamón tunnel in Bolueta belonging to Line 1 of the Bilbao Metro at the “Bolueta – Etxebarri” section, 70 m² section and 130 m […]

GI-638 (Deba-Mutriku) highway improvement building project. Alkolea tunnel.

Improvements to the GI-638 highway between Deba and Mutriku requires the building of the de Alkolea tunnel. Its total length is 106 m, of which the central section is 80 […]

Amended Project Nº1. Barcelona Orbital Dual Carriageway Section: Olesa de Montserrat-Viladecavals. Olesa Tunnel

The Olesa capital is part of the Barcelona Orbital Dual Carriageway construction project, in the section between Olesa de Montserrat and Viladecavalls. This is a two-way tunnel with two independent […]

Ermua South Bypass Construction Project. Uretamendi Tunnel

The project involved the construction of the Uretamendi tunnel, made up of two parallel tunnels, one in each direction, with two carriageways on each. East Tunnel (axis 42): will have […]