The works in the Rante tunnel (Ourense) have included the execution of the following works: A double track monotube tunnel with a total length of 3,410m and an excavation section […]
The Meagas tunnel is located on the Bilbao-Donostia line, within the municipality of Getaria, and has a daily traffic of trains belonging to the E1 line of Euskotren. The E1 […]
The line between Orense and Lugo is made up of two different sections of single-track Iberian gauge (1,668 mm) railway lines with their common point in Monforte de Lemos: Orense-Monforte […]
The route between Orense and Lugo is composed of two different sections of single-track railway lines in Iberian gauge (1,668 mm) with their common point in Monforte de Lemos: Orense-Monforte […]
Tunnel 3 belongs to the Donostia-Hendaia line of the conventional Basque Railway Network – Euskal Trenbide Sarea, (ETS) and is located in Donosti, in the province of Gipuzkoa, between the […]
The works comprise the construction of the branch tunnels of the Praça da Liberdade – Casa da Música section, part of the Circular Line of the Porto Metro. The project […]
The construction project for the upgrading of the N-260 between Congosto del Ventalmillo and Campo includes the construction of two two-lane tunnels, Tunnel 1 (265 m) and Tunnel 2 (540 […]
The Bodovalle mine was the largest open-pit siderite mine in the Biscayan mining basin. It was exploited in open pit until 1885. From that date, the mineral extraction was carried […]
“El Callejo” tunnel is located between the km 621 + 192 and 621 + 318.1, with a total length of 126.10 meters. “El Arroyo” tunnel is located between the km […]