ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Buciero Tunnel. Santoña – Laredo – Colindres Collector.

Date 05/03/2007
Type of works Galleries, Hydraulics

Project description

A tunnel 1500 m in length and with a 16 m² section to install a collector. Excavated using blasting and mechanical means on highly karstified limestone.

Multimedia material

Used machinery

There's is no machinery to show