Calatayud diversion tunnel. Hydraulic correction of the Barranco de las Pozas
Date
08/09/2009
Type of worksGalleries, Hydraulics
Project description
Tunnel with a length of 308.91 m with an excavation section of some 23 m². The excavation took place using mechanical methods (ITC) in conglomerate and clay loam.