ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Calatayud diversion tunnel. Hydraulic correction of the Barranco de las Pozas

Date 08/09/2009
Type of works Galleries, Hydraulics

Project description

Tunnel with a length of 308.91 m with an excavation section of some 23 m². The excavation took place using mechanical methods (ITC) in conglomerate and clay loam.

Multimedia material

Used machinery

There's is no machinery to show