The construction project for the upgrading of the N-260 between Congosto del Ventalmillo and Campo includes the construction of two two-lane tunnels, Tunnel 1 (265 m) and Tunnel 2 (540 m). Tunnel 2 includes an evacuation gallery of 110 ml, belonging to the work "Conditioning of the N-260. Section: Congosto del Ventalmillo - Campo", province of Huesca.
The sequence of works began with the excavation of Tunnel 2 and the evacuation gallery. Subsequently, Tunnel 1 was also excavated from its southern mouth.