The Toses tunnel has a length of 3,904 m and is located between PP.KK 29+745 and 33+649.
The repair areas total 947 meters where the following actions have been carried out:
- Resurfacing of the revetment
- Reconstruction of the support
- Longitudinal drainage
- Treatment of the backfill