Les Fosses Tunnel. L’Eix transversal split. C-25 Highway
Date
27/12/2010
Type of worksHighway, Tunnels
Project description
Tunnel with a length of 453 m with an excavation section of some 84.47 m². Completed following the NATM, via blasting and mechanical means (backhoe) on fractured granite.