ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Line 2 F.M.B. Sestao – Portugalete Section

Date 16/01/2003
Type of works Caverns, Tunnels, Underground, Wells

Project description

Completion of 1,761 m of two-way tunnels on Line 2 of the Bilbao Metro between Sestao y Portugalete with two cavern stations and the corresponding access cannons and lift shafts, as well as galleries and ventilation shafts. Excavation of tunnels, caverns and galleries which took place using heavy shearers. The shafts were excavated via raise boring.

Multimedia material

Used machinery

There's is no machinery to show