ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Llobregat Tunnel. High-speed railway line Madrid-Barcelona

Date 17/09/2003
Type of works Railway, Tunnels

Project description

320 m tunnel with 120 m² section, excavated using mechanical means on limolites and sandstone using horizontal stratification.

Multimedia material

Used machinery

There's is no machinery to show