ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

N-634 Eibar Bypass Construction Project. Phase 3

Date 29/10/2009
Type of works Highway, Tunnels

Project description

Including a section of single lane highway, 2 km in length, whose main parts were:
  • The Amaña and Katillu tunnels, 245 m and 185 m in length respectively.
  • The Ego River viaduct. A 4 vane isostatic bridge, with pre-fabricated beams.
  • The Legarre Bridge, which has a length of 80 m and consists of a two vane pretensioned cement structure.

Multimedia material

Used machinery

There's is no machinery to show