ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Experience

List Map

Reparations of inlet and outlet in Zankoeta II Tunnel

The actions carried out in the Zankoeta II Tunnel consisted of:   Filling of the track area to a level higher than the current tunnel key to stabilize the slope […]

Improvement works on slopes of the Bilbao-Donostia Line. Lot 1: Deba Station at km 72 + 450

The works consisted of the Conditioning and improvement of stability on the slopes between the Deba and Zumaia stations of the Bilbao-Donosti Line, for this, the following actions were carried […]

A-27. Tarragona Mont-Blanc. Tramo: variante de Valls - Montblanc. Túnel Lilla

En el tramo Variante de Valls – Montblanc de la autovía A-27 (Tarragona – Montblanc) situado en la provincia de Tarragona, se ha ejecutado un túnel de dos tubos gemelos […]

Security works at Arditurri gallery

The works that were carried out in the Arditurri mine were the following: Security work at a point in the mining gallery. Triple twist mesh placement. Placement of mini prisms […]

Structural reinforcement of the Santander-Bilbao metre-gauge railway line. Ambroser Tunnel.

The Ambrosero tunnel is located in The Cantabrian town of Ambrosero and is part of the Santander-Bilbao metre-gauge railway line.The works carried out for the structural reinforcement, drainage replacement and […]

GI-638 (Deba-Mutriku) highway improvement building project. Alkolea tunnel.

Improvements to the GI-638 highway between Deba and Mutriku requires the building of the de Alkolea tunnel. Its total length is 106 m, of which the central section is 80 […]

Amended Project Nº1. Barcelona Orbital Dual Carriageway Section: Olesa de Montserrat-Viladecavals. Olesa Tunnel

The Olesa capital is part of the Barcelona Orbital Dual Carriageway construction project, in the section between Olesa de Montserrat and Viladecavalls. This is a two-way tunnel with two independent […]

Execution of the Mina Fraguiña Project

Execution of 1,045 meters, of which 410 meters correspond to the execution of central galleries of 30 m2, with widening areas to form caverns of 200 meters in length and […]