The works to be carried out in the San Lorentzo Tunnel consisted of carrying out the following actions:
- Preliminary work: cleaning, excavation and scraping of the tunnel.
- Supporting the tunnel and waterproofing projected using Mapei, Mapelastic TU System.
- Installation of drains and asphalting the tunnel.
The tunnel has a length of 770 m and a section of 22 m2.