ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

Rigoitia tunnel shaft

Date 01/10/2001
Type of works Galleries, Mining, Wells

Project description

Operation system of the quarry with a tunnel of 45 m² section and 87 m in length, which feeds to a 4 m diameter and 140 m depth shaft with a 73° gradient with the vertical.

Multimedia material

Used machinery

There's is no machinery to show