ESP
+34 944 240 835 Gran vía 53, 3º Dcha - 48011 Bilbao

San Marcial Tunnel

Date 18/10/2001
Type of works Highway, Tunnels

Project description

Excavation and support of two parallel dual carriageway tunnels with hard shoulders, 1480 m each on the Eibar-Vitoria motorway.

Multimedia material

Used machinery

There's is no machinery to show