The Murón Tunnel. Levante High Speed Train Access (AVE). Section: Aspe – El Carrús

Date 10/08/2010
Type of works Railway, Tunnels

Project description

Tunnel with a length of 1,456 m with an excavation section of some 120 m². Completed following the NATM, via blasting and mechanical means (backhoe) on cemented conglomerates, clay and sandstone loams.